The
new extension in the COLLEGE
SACRE-COEUR consists of a 7 story concrete building with 3 basements.
The main challenge in this project was the restricted time frame
since the shoring works needed to be finished in a very quick way to allow
the erection of the building prior to the school start in the coming fall.
Technically 2 sides were of concern: the main road on one side and the Old
Procurement building on the other side, which could not tolerate any
movement. The planned
excavation was 9m deep on the average.
The
Soil was Sandy and clayey fill on the top 6 meters, then a calcareous marl
below. The water table was
encountered at a depth of 8m.
I.G.M.
proposed a nailed shotcrete wall reinforced with vertical micropiles on
the main road side, and an anchor/pile system on the Procurement building
side. The piles were 25cm in
diameter with a 70cm spacing c/c and 2 rows of active anchors tensionned
against concrete waler beams.
SUMMARY
OF WORKS